A can do a work in 20 days and B in 30 days. If they work on it together for 2 days, then what is the fraction of the work that is left?
Solution :
The correct option is 5/6.
Step-by-step explanation:
Step 1: Determine the rate of work for A and B per day.
A can complete the full work in 20 days. Therefore, work done by A in 1 day =
B can complete the full work in 30 days. Therefore, work done by B in 1 day =
Step 2: Find the combined work done by both in 1 day.
Work done by (A + B) in 1 day =
Taking the least common multiple (LCM) of 20 and 30, which is 60:
Work done by (A + B) in 1 day =
Step 3: Calculate the work completed in 2 days.
Work done in 2 days =
Step 4: Calculate the remaining fraction of work.
Fraction of work left =
Thus, the fraction of work that is left is 5/6.
Completely free for students. Educators & coaching institutes get 2 months free Pro trial to create tests.
Access unlimited practice questions, detailed step-by-step solutions, and exam study materials — completely free for students.
Create and conduct professional online assessments with AI question generation, tab proctoring, and comprehensive batch management.
SSC CHSL Tier-1 Shift 1 2 July 2024 question paper with answers and detailed solutions. This practice paper covers questions from General Intelligence & Reasoning, General Awareness, Quantitative Aptitude, and English Language as asked in the SSC CHSL Tier-1 examination. Practice the SSC CHSL 2 July 2024 Shift 1 paper to understand the exam pattern, question types, difficulty level, and important topics for upcoming SSC CHSL exams.
SSC CHSL Tier-1 Shift 2 held on 2 July 2024 question paper with answers and detailed solutions. This previous year paper covers General Intelligence & Reasoning, Quantitative Aptitude, General Awareness, and English Language. The SSC CHSL Tier-1 exam was conducted in CBT mode with 100 questions for 200 marks and a 60-minute duration.
Copyright © 2026 Combe Labs Private Limited. All Rights Reserved.