Directions: Solve the following word problem.
A team of 9 senior developers and 8 junior developers can finish a software module in 12 days, while 6 senior developers and 8 junior developers can complete the same module in 15 days. If K senior developers and 10 junior developers can complete the module in 8 days, find the value of K.
Correct Answer :
15
Solution :
The correct answer is 15.
Step 1: Define variables for daily work rate.
Let be the work done by one senior developer in one day.
Let be the work done by one junior developer in one day.
Let be the total work required to finish the software module.
Step 2: Formulate equations based on the given conditions.
From the first condition, 9 senior developers and 8 junior developers complete the module in 12 days:
--- (Equation 1)
From the second condition, 6 senior developers and 8 junior developers complete the module in 15 days:
--- (Equation 2)
Step 3: Relate senior developer work rate to junior developer work rate.
Equating Equation 1 and Equation 2:
Subtracting and from both sides:
Dividing both sides by 6:
Step 4: Calculate total work in terms of .
Substituting into Equation 1:
Step 5: Solve for .
We are given that senior developers and 10 junior developers complete the module in 8 days:
Substitute and :
Divide both sides by :
Therefore, the value of is 15.
Access expert-curated educational resources and study materials—completely free.
Create, conduct, and manage professional online assessments with Mindyard. Perfect for teachers and institutes.
Copyright © 2026 Mindyard. All Rights Reserved.