8 men can complete a work in 45 days. 8 women can complete the same work in 18 days. In how many days will 5 men and 8 women, together, complete the same work?
Solution :
The correct answer is 14 days.
We are given:
- 8 men can complete the work in 45 days.
- 8 women can complete the same work in 18 days.
- We need to find how many days 5 men and 8 women together will take.
Step 1: Find the work done by 1 man per day (1 man's daily work rate)
If 8 men complete the work in 45 days, then total work = 8 × 45 = 360 man-days.
So, 1 man's 1 day work =
Step 2: Find the work done by 1 woman per day (1 woman's daily work rate)
If 8 women complete the work in 18 days, then total work = 8 × 18 = 144 woman-days.
So, 1 woman's 1 day work =
Step 3: Find the combined 1 day work of 5 men and 8 women
Work done by 5 men in 1 day:
=
Work done by 8 women in 1 day:
=
Combined 1 day work of 5 men + 8 women:
+
Finding the LCM of 72 and 18, which is 72:
+ =
Step 4: Find the total number of days required
If they together complete of the work in 1 day, then they will complete the full work in:
= 14.4 days = 14 days
Therefore, 5 men and 8 women together will complete the work in 14 days.
Completely free for students. Educators & coaching institutes get 2 months free Pro trial to create tests.
Access unlimited practice questions, detailed step-by-step solutions, and exam study materials — completely free for students.
Create and conduct professional online assessments with AI question generation, tab proctoring, and comprehensive batch management.
A comprehensive SSC MTS 2026 Mock Test 4 designed to help aspirants strengthen their preparation and improve their performance for the Staff Selection Commission Multi-Tasking Staff examination. This mock test covers all major sections including Numerical and Mathematical Ability, Reasoning Ability and Problem Solving, General Awareness, and English Language and Comprehension. It includes a balanced combination of conceptual, analytical, and exam-oriented multiple-choice questions aligned with the latest SSC MTS syllabus and exam pattern. Ideal for practice, revision, self-evaluation, accuracy improvement, speed enhancement, and effective time management, this mock test helps candidates assess their exam readiness, identify improvement areas, and build confidence for the SSC MTS 2026 examination
A comprehensive SSC MTS 2026 Mock Test 3 designed to help aspirants prepare thoroughly for the Staff Selection Commission Multi-Tasking Staff examination. This mock test covers all important sections including Numerical and Mathematical Ability, Reasoning Ability and Problem Solving, General Awareness, and English Language and Comprehension. It features a carefully curated set of multiple-choice questions that test conceptual understanding, logical reasoning, problem-solving skills, speed, and accuracy in accordance with the latest SSC MTS exam pattern. Ideal for practice, revision, self-assessment, performance evaluation, and time management improvement, this mock test enables candidates to identify strengths and weaknesses while building confidence for the SSC MTS 2026 examination.
Copyright © 2026 Combe Labs Private Limited. All Rights Reserved.