Engineer P can assemble a software module in 20 hours, while Engineer Q can complete the same module independently in 30 hours. P and Q collaborate on the task for 6 hours, after which Engineer R takes over and replaces them both. If R completes 40% of the remaining work, what percentage of the total assembly work was performed by R?
Correct Answer :
20%
Solution :
Correct Answer: 20%
Step-by-Step Explanation:
Step 1: Calculate the work rates of Engineer P and Engineer Q
Let the total software module assembly work be equal to 1 unit.
Engineer P takes 20 hours to finish the module independently. Therefore, P's work rate per hour is:
Engineer Q takes 30 hours to finish the module independently. Therefore, Q's work rate per hour is:
Step 2: Calculate the work completed by P and Q together in 6 hours
The combined rate of work when P and Q collaborate is:
Since they work together for 6 hours, the fraction of total work completed by P and Q is:
Thus, P and Q complete 50% of the total work.
Step 3: Calculate the remaining work
After P and Q work for 6 hours, the remaining portion of work is:
In terms of percentage, 50% of the total work remains to be completed.
Step 4: Calculate the percentage of work done by Engineer R
Engineer R takes over and completes 40% of the remaining work.
Hence, Engineer R performed 20% of the total assembly work.
Access expert-curated educational resources and study materials—completely free.
Create, conduct, and manage professional online assessments with Mindyard. Perfect for teachers and institutes.
Copyright © 2026 Mindyard. All Rights Reserved.