A and B can complete a piece of work in 12 days and 18 days respectively. They start working together, but after 4 days, A leaves the work. In how many days will B alone complete the remaining work?
Correct Answer :
8
Solution :
The correct answer is 8.
Step 1: Determine the daily work rate of A and B.
Let the total work be represented as 1 unit.
Work done by A in 1 day =
Work done by B in 1 day =
Step 2: Calculate the work done by A and B together in 1 day.
Combined work in 1 day =
Taking the Least Common Multiple (LCM) of 12 and 18, which is 36:
Combined work in 1 day =
Step 3: Calculate the total work completed in 4 days.
Since A and B worked together for 4 days before A left:
Work completed in 4 days =
Step 4: Calculate the remaining work.
Remaining work =
Step 5: Calculate the time taken by B alone to finish the remaining work.
Days required by B =
Days required by B = days.
Therefore, B alone will complete the remaining work in 8 days.
Access expert-curated educational resources and study materials—completely free.
Create, conduct, and manage professional online assessments with Mindyard. Perfect for teachers and institutes.
Copyright © 2026 Mindyard. All Rights Reserved.