A can complete a piece of work in 4 hours and B can complete it in 6 hours. In how much time (in hours) will they together complete the work?
Correct Answer :
2 hours 24 minutes
Solution :
The correct answer is 2 hours 24 minutes.
To find the time taken by A and B to complete the work together, we can determine their individual rates of work per hour.
A can complete the work in 4 hours, which means A's work rate per hour is:
of the total work.
Similarly, B can complete the work in 6 hours, which means B's work rate per hour is:
of the total work.
When working together, their combined work rate per hour is the sum of their individual rates:
To add these fractions, we find the least common multiple (LCM) of 4 and 6, which is 12:
Thus, they together complete:
of the work in 1 hour.
The total time required for them to complete the entire work together is the reciprocal of their combined rate:
Now, let us convert this value into hours and minutes:
Calculating the minutes:
Therefore, they will complete the work together in 2 hours 24 minutes.
Access expert-curated educational resources and study materials—completely free.
Create, conduct, and manage professional online assessments with Mindyard. Perfect for teachers and institutes.
Copyright © 2026 Mindyard. All Rights Reserved.