A man completes 7/8 of a job in 21 days. How many more days will it take him to finish the job if quantum of work is further increased by 50%?
Correct Answer :
15
Solution :
The correct answer is 15.
Let's break down the problem step-by-step to find out how many more days will be required to finish the increased work.
Step 1: Calculate the total time required for the initial full job
The man completes
of the job in 21 days.
Let the total initial work be represented as 1 unit.
Time taken to complete 1 full unit of initial work =
days.
Step 2: Determine the remaining work of the initial job
Remaining fraction of the initial work =
unit.
Step 3: Calculate the extra work added
The total quantum of work is increased by 50%.
Extra work added = 50% of 1 unit = 0.5 units =
unit.
Step 4: Calculate the total remaining work to be completed
Total remaining work = (Remaining fraction of initial work) + (Extra work added)
units.
Step 5: Calculate the number of days required to finish the remaining work
Since 1 full unit of work takes 24 days, the time required to complete
units of work is:
days.
Thus, it will take him 15 more days to finish the job.
Access expert-curated educational resources and study materials—completely free.
Create, conduct, and manage professional online assessments with Mindyard. Perfect for teachers and institutes.
Copyright © 2026 Mindyard. All Rights Reserved.