Question Details

In the Critical Path Method (CPM), the cost-time slope of an activity is given by

Options

A

C r a s h C o s t − N o r m a l C o s t C r a s h T i m e

B

N o r m a l C o s t C r a s h T i m e − N o r m a l T i m e

C

C r a s h C o s t − N o r m a l C o s t N o r m a l T i m e − C r a s h T i m e

D

C r a s h C o s t C r a s h T i m e − N o r m a l T i m e

Show Answer
Correct Answer
C
C r a s h C o s t − N o r m a l C o s t N o r m a l T i m e − C r a s h T i m e

Solution :

The correct answer is:
Crash Cost - Normal Cost Normal Time - Crash Time

Analysis of the Graph:
In project management under the Critical Path Method (CPM), project crashing is a method used to shorten the duration of an activity by allocating additional resources. The graph provided in the image demonstrates this cost-time relationship for a project activity:
- The vertical y-axis represents the Cost, with key markers at the Normal Cost (denoted as Cn) and the Crash Cost (denoted as Cc).
- The horizontal x-axis represents the Time, with key markers at the Crash Time (denoted as tc) and the Normal Time (denoted as tn).
- A curve (shown as a solid line) represents the actual cost-time trade-off, while the dashed line directly connects the normal state point (tn, Cn) and the crashed state point (tc, Cc).

Mathematical Derivation:
The cost-time slope is defined as the rate at which the cost increases as the activity time is reduced. It is represented by the absolute value of the slope of the line connecting the normal and crash points:

Slope (Magnitude) = Change in Cost Change in Time

Since reducing the time from tn to tc (a positive time saving of tn - tc) causes the cost to rise from Cn to Cc (a cost increase of Cc - Cn), the formula for the cost slope is:

Cost-Time Slope = Cc - Cn tn - tc

Substituting the variable names back into the equation yields:
Cost-Time Slope = Crash Cost - Normal Cost Normal Time - Crash Time

Transparent Access on Mindyard

Built for Learners & Educators Alike

Completely free for students. Educators & coaching institutes get 2 months free Pro trial to create tests.

FREE FOR STUDENTS

Practice & Learn Free for Students

Access unlimited practice questions, detailed step-by-step solutions, and exam study materials — completely free for students.

  • Unlimited mock tests & question bank practice
  • Full access to curated study library & formula notes
  • 100% free for students • No credit card required
2 MONTHS FREE TRIAL

Educators & Coaching Institutes

Create and conduct professional online assessments with AI question generation, tab proctoring, and comprehensive batch management.

  • AI question uploader & rapid test generator
  • Anti-cheating tab proctoring & performance reports
  • Full Pro access free for 60 days • No upfront commitment
Discover more resources

You may also like

Mock Tests

View All
  • GATE
  • intermediate
  • 3 hours
  • mechanical engineering

The GATE 2026 Mechanical Engineering (ME) examination scheduled for 14 February 2026 is one of the most important national-level competitive exams for engineering graduates aspiring for higher education and prestigious career opportunities in PSU and research organizations. Conducted annually at the national level, the GATE Mechanical Engineering paper evaluates candidates on core subjects such as Engineering Mechanics, Thermodynamics, Fluid Mechanics, Strength of Materials, Manufacturing Processes, and Machine Design, along with General Aptitude and Engineering Mathematics. This examination is a gateway for admission into M.Tech/Ph.D. programs at IITs, NITs, IISc, and other top institutions, as well as recruitment in major Public Sector Undertakings (PSUs) like ONGC, NTPC, BHEL, IOCL, and more. The GATE ME 2026 paper will test conceptual understanding, analytical thinking, and problem-solving ability, making strong preparation essential for success. Candidates are advised to practice previous year papers, mock tests, and focus on conceptual clarity for high scoring performance. This exam on 14/02/2026 is a crucial opportunity for mechanical engineering aspirants to secure their future in academia and industry.

  • GATE
  • intermediate
  • 3 hours
  • mechanical engineering

Strengthen your preparation with this GATE 2025 Mechanical Engineering (ME) test, covering core subjects such as thermodynamics, fluid mechanics, strength of materials, theory of machines, and manufacturing engineering. With a well-balanced mix of conceptual and numerical questions, this test helps enhance problem-solving ability and technical understanding. Aligned with the latest exam pattern, it is ideal for improving accuracy, speed, and overall exam readiness.

Ask AI Tutor
5 left
Q1 View Question & Options
AI Tutor is solving this question...
Reading question context & options...
Ask your own doubt or choose a quick prompt: