The correct sequence of machining operations to be performed to finish a large diameter through hole is
Solution :
The correct answer is drilling, boring, reaming.
To finish a large diameter through hole in a solid workpiece, a sequence of operations must be followed to progress from a solid state to a highly accurate, finished large-diameter hole. The logical sequence is explained below step-by-step:
1. Drilling:
Drilling is the primary machining process used to originate a hole in a solid material using a rotating tool called a twist drill. Because drilling is a roughing operation, the resulting hole may not have perfect circularity, alignment, or the required large diameter. Therefore, it serves as the starting point.
2. Boring:
Boring is the operation of enlarging an existing hole that has already been drilled. A single-point cutting tool is typically used in boring. This process is crucial for finishing a large diameter hole because it corrects any eccentricity, ensures the hole is perfectly straight and concentric, and enlarges the hole to a size just slightly smaller than the final required dimension.
3. Reaming:
Reaming is the final sizing and finishing operation. A reamer is a multi-fluted cutting tool designed to remove a very small amount of material (typically a fraction of a millimeter) from the pre-bored hole. Reaming does not correct the alignment or position of the hole, which is why it must follow boring. Its sole purpose is to provide excellent dimensional accuracy, tight tolerances, and a high-quality surface finish.
Thus, the sequence starts with creating the initial hole (drilling), enlarging and straightening it (boring), and finally finishing it to the exact size (reaming).
Completely free for students. Educators & coaching institutes get 2 months free Pro trial to create tests.
Access unlimited practice questions, detailed step-by-step solutions, and exam study materials — completely free for students.
Create and conduct professional online assessments with AI question generation, tab proctoring, and comprehensive batch management.
The GATE 2026 Mechanical Engineering (ME) examination scheduled for 14 February 2026 is one of the most important national-level competitive exams for engineering graduates aspiring for higher education and prestigious career opportunities in PSU and research organizations. Conducted annually at the national level, the GATE Mechanical Engineering paper evaluates candidates on core subjects such as Engineering Mechanics, Thermodynamics, Fluid Mechanics, Strength of Materials, Manufacturing Processes, and Machine Design, along with General Aptitude and Engineering Mathematics. This examination is a gateway for admission into M.Tech/Ph.D. programs at IITs, NITs, IISc, and other top institutions, as well as recruitment in major Public Sector Undertakings (PSUs) like ONGC, NTPC, BHEL, IOCL, and more. The GATE ME 2026 paper will test conceptual understanding, analytical thinking, and problem-solving ability, making strong preparation essential for success. Candidates are advised to practice previous year papers, mock tests, and focus on conceptual clarity for high scoring performance. This exam on 14/02/2026 is a crucial opportunity for mechanical engineering aspirants to secure their future in academia and industry.
Strengthen your preparation with this GATE 2025 Mechanical Engineering (ME) test, covering core subjects such as thermodynamics, fluid mechanics, strength of materials, theory of machines, and manufacturing engineering. With a well-balanced mix of conceptual and numerical questions, this test helps enhance problem-solving ability and technical understanding. Aligned with the latest exam pattern, it is ideal for improving accuracy, speed, and overall exam readiness.
Copyright © 2026 Combe Labs Private Limited. All Rights Reserved.