X people were given a contract for doing a piece of work in 18 days. 2 people did not turn up to work due to sickness, and the rest of the people completed the work in 27 days. What is the value of X?
Correct Answer :
6
Solution :
The correct option is 6.
Let us understand the problem step-by-step using the concept of man-days (the total amount of work done). The total work is equal to the product of the number of people and the number of days they work.
Initially, people were contracted to complete the work in 18 days.
Therefore, the total work can be represented as:
Total Work = man-days
However, 2 people did not turn up. This means the actual number of people who worked is:
people
These remaining people completed the same piece of work in 27 days.
So, the total work can also be represented as:
Total Work = man-days
Since the total work remains constant in both cases, we can equate the two expressions:
Now, let us solve the equation for :
Divide both sides by 9 to simplify the numbers:
Expand the right side:
Rearrange the equation to isolate :
Thus, the value of is 6, indicating that 6 people were initially contracted for the work.
Access expert-curated educational resources and study materials—completely free.
Create, conduct, and manage professional online assessments with Mindyard. Perfect for teachers and institutes.
Copyright © 2026 Mindyard. All Rights Reserved.