Question Details

Two generating units rated for 250 MW and 400 MW have governor speed regulations of 6% and 6.4%, respectively, from no load to full load. Both the generating units are operating in parallel to share a load of 500 MW. Assuming free governor action, the load shared in MW, by the 250 MW generating unit is ______. (round off to nearest integer)

Show Answer
Correct Answer
200

Solution :

The correct answer is 200.

Step-by-step Explanation:

Let us define the parameters for the two generating units operating in parallel:

For Unit 1 (250 MW unit):
Rated capacity: PR1=250 MW
Governor speed regulation: R1=6%=0.06

For Unit 2 (400 MW unit):
Rated capacity: PR2=400 MW
Governor speed regulation: R2=6.4%=0.064

Let the load shared by Unit 1 be P1 (in MW) and the load shared by Unit 2 be P2 (in MW).

The total load shared by both units is 500 MW:
P1+P2=500

Assuming free governor action, both units operate at the same system frequency. Therefore, the change in frequency (or percentage drop in speed/frequency from no load to the operating load) must be identical for both generators:

R1⋅P1PR1=R2⋅P2PR2

Substituting the given values into the equation:
0.06⋅P1250=0.064⋅P2400

Simplifying the relation:
625000P1=6.440000P2
625000P1=425000P2
6P1=4P2
P2=1.5P1

Now, substitute this relationship into the total load equation:
P1+1.5P1=500
2.5P1=500
P1=5002.5=200 MW

Thus, the load shared by the 250 MW generating unit is 200 MW.

Transparent Access on Mindyard

Built for Learners & Educators Alike

Completely free for students. Educators & coaching institutes get 2 months free Pro trial to create tests.

FREE FOR STUDENTS

Practice & Learn Free for Students

Access unlimited practice questions, detailed step-by-step solutions, and exam study materials — completely free for students.

  • Unlimited mock tests & question bank practice
  • Full access to curated study library & formula notes
  • 100% free for students • No credit card required
2 MONTHS FREE TRIAL

Educators & Coaching Institutes

Create and conduct professional online assessments with AI question generation, tab proctoring, and comprehensive batch management.

  • AI question uploader & rapid test generator
  • Anti-cheating tab proctoring & performance reports
  • Full Pro access free for 60 days • No upfront commitment
Discover more resources

You may also like

Mock Tests

View All
  • GATE
  • intermediate
  • 3 hours
  • electrical engineering

Prepare for success in the GATE Electrical Engineering exam with our comprehensive Ultimate Revision Test. Designed for aspirants aiming for top scores, this test covers all key topics in the GATE EE syllabus, including Circuit Theory, Electromagnetic Fields, Power Systems, Electrical Machines, Control Systems, and Analog & Digital Electronics. Our revision test offers a balanced mix of theory-based and application-based questions that will help you assess your understanding and boost your problem-solving skills. With carefully selected questions that mirror the difficulty level of the actual GATE exam, this test will help you identify areas for improvement and fine-tune your exam strategy.

  • GATE
  • beginner
  • 3 hours
  • civil engineering

Prepare for GATE 2026 Civil Engineering with the latest question papers, previous year papers, detailed solutions, syllabus, exam pattern, preparation tips, mock tests, and subject-wise study material. Download GATE 2026 CE question papers with solutions in PDF format and boost your preparation for top engineering institutes and PSU recruitment.

Ask AI Tutor
5 left
Q1 View Question & Options
AI Tutor is solving this question...
Reading question context & options...
Ask your own doubt or choose a quick prompt: